Utilising a Helicopter Lift for a Tower Deployment in Scotland | Swann Engineering Group

Swann Engineering Group Ltd3:542021Science & Tech

Swann Engineering Group worked alongside a specialist helicopter which assisted with the successful deployment of our 25 metre 5SH Lattice telecommunication tower in Oban, West Scotland. The remote nature of the installation location, combined with very limited site access, meant that we had to utilise a purpose-built lifting helicopter to lift and transport our structure from the assembly point to the install site approximately 150 metres away. To find out more about this project, please visit: 🌐: https://swanngroupltd.com/oban-helicopter-lift/ --- For more information on our wide range of capabilities and solutions, visit our website! 🌐: https://swanngroupltd.com/ Or keep up to date with our latest news and announcements via our social media: 🌐 LinkedIn: http://www.linkedin.com/company/swann-group-ltd 🌐 Twitter: https://twitter.com/SwannGroupLtd

Landed here from a link? Roll your own.

🎲 Roll the Dice

Played through the official embedded player. Watch on YouTube.